Quantity Surveyor / Cost Manager to work in a hybrid capacity at their RAF Wyton base.
The role will be on an initial 3-month basis, but the contract is expected to run up to 6 months and potentially beyond, on Defence Infrastructure projects. It will require 2 days p/w on site, and 3 days remote, but there can be some movement on this.
Experience Required:
Infrastructure / DIO / MOD / RAF E...